Walk-in Shower
Remove Tub
INITIAL PICS






Rough-out for 14X24 niche.

Texture and white, ready for blue.

Back to blue, ready to pull vanity.

Now to get the main drain moved.

Front wall rocked and taped.


Vanity area texture blend.

Beginning to pull tar, then rotary hammer.

Ready for concrete.

Mudding in the new piping.

Second pour, curing.

Dry-fit completed, ready for mortar.

Curb in, and sealed in Kerdi band.



Good bye Tub.

Thanks for your service.

24" H-cap rail backer wood.

Slight dip in wall, mudding in.

Checking the Niche fit.

Plumbing converted, 48 hr leak test passed.


After texture/primer, back to blue.

Toilet drain rebuilt and ready for anchors.

New valves, blue paint completed.

Had to drop 3" so, back into the soil I went.

Where I need to be as far as height.

1st pour, with a dam.

Now to plug the sheetrock.

Curing.
MORE TO FOLLOW